Water Crisis in India: The Present and The Future

Queue for daily water collection

Introduction

Water is the most essential element of life and livelihood. And India is having a hard time, coping up with the severe crisis of water. India constitutes 16 per cent of the world’s population, but the country has only four per cent of the world’s freshwater resources. With the changing weather patterns and recurring droughts, India is now declared as “water stressed”.

Statistical representation of India‘s Water Crisis

Background

Archaeological researchers had assumed the fall of Great Indus Civilisation was due to a catastrophic water scarcity caused either by shifting rivers or by drastic climate change that forced people to abandon city settlements. And history seems to repeat for present day India again. According to a NITI Aayog report in 2018, about 600 million people, or nearly half of India’s population, are facing extreme scarcity of water. The three-fourths of India’s rural households do not have stable running water supply and rely on sources that can cause serious health risks. The report also stated that India has become the world’s largest extractor of groundwater, accounting for 25% of the total. Moreover, 70% of the water sources were labelled as contaminated .And the conclusion of the report was ‘India is suffering from its worst water crisis in its history.’ It also pointed out 21 Indian cities to be run out of groundwater by 2020.

Reasons behind Water Crisis in India

1. Climate Change : The North-East monsoon is responsible for 10%-20% rainfall of the total rainfall in India, while the South-West monsoon provides approximately 80% of rainfall. In 2018, the North-East monsoon decreased by 44% and the South-West monsoon was deficient by 10%, causing the total rainfall in the area to decrease by 36 percent in comparison to the 50-year average. Because of the lower rainfall, water levels in reservoirs across the country decreased and led to extreme shortages of water in many major cities of India

. 2. Ground Water Extraction: Groundwater meets more than half of the country’s need of water supply and nearly 89% of the groundwater extracted in India is used for irrigation purposes. The traditional techniques of irrigation are also to blame for the water crisis as they result in a majority of water loss and evaporation during the irrigation process.

3. Pollutions in Our Rivers: Due to the lack of long term water management plans, most of the country’s rivers either run dry or have remained polluted over decades. The national river of Ganges is also the one that is most severely polluted, which is mainly resulted from untreated sewage of densely populated cities, industrial waste as well as due to religious ceremonies in and around the river.

4. Wastage of Unmanaged Water : According to the Central Water Commission, even though climate change has resulted in a reduction in rainfall and lack in underground water reservoirs, the country still receives enough rainfall to meet the needs of over 1 billion people. However, India only catches only 8 percent of its annual rainfall due to poor rainwater harvesting. Also for lacking the treatment of wastewater reuse, approximately 80% of domestic wastewater is drained out as waste and ends up flowing into salt water bodies.

Struggle for daily water collection in water-stressed areas of India

Effects of Water Crisis in India: Where We Stand Today

As many as 256 of 700 districts have reported ‘critical’ or ‘over exploited’ groundwater levels, according to a data from the Central Ground Water Board (2017). Fetching water in India has been perceived as a women’s job for centuries, especially in the rural areas. As groundwater resources come under increasing pressure due to over-reliance and unsustainable consumption, wells, ponds drying out fast, escalating the water crisis and placing even greater burden of accessing water on women. A rural woman in Rajasthan walks over 2.5 kilometres to reach a water source, according to a report by the National Commission for Women. Moreover, according to a non-profit named Water, women around the world spend a collective 200 million hours fetching water for their family. In addition to the time spent collecting water, millions may also spend significant amounts of time finding a place to go to relieve themselves. This makes up an additional 266 million hours lost each day. The acute crisis has even led to polygamy in one drought-prone village of Maharashtra. This involves having more than one spouse to collect water. The arrangement is termed as ‘water wives’.

The struggle for women

The Solution to the Crisis: Future Stands

Children also becoming victims of Water Crisis

The Government has taken up the most important role to eradicate the crisis by forming the Ministry of Jal Shakti and launching “Jal Jeevan mission”- Rural in 2019 to promote “Har Ghar Jal” by 2024. Goa and Telengana have achieved the first two Indian states to reach “Har Ghar Jal“, while Andaman & Nicobar Islands and Puducherry became first Indian Union Territories to reach the milestone. In 2021, “Jal Jeevan mission”-Urban was launched to complement the project. “Jal Shakti Abhiyan-Catch the rain” is also introduced to capture and reuse of rain water at the grassroot level as a Jan Andolan. Along with this, for the cleaning and filtration of Ganges river “Namami Gange” had been rolled out as a national flagship mission. Coastal Reservoirs, Desalination of sea water and improved irrigation techniques are now been adopted to address the crisis.

Conclusion

Along with time, active participation from every layer of society in solving the water crisis of India is being witnessed. The youth has come forward with an appealing message to properly addresses the crisis and solve the drawbacks together. Now, the emerging awareness spreading among masses India can hope for a better future to handle the crisis more effectively.

Water Resources, River Development & Ganga Rejuvenation

 The key initiatives/achievements of Department of Water Resources, River Development & Ganga Rejuvenation, Ministry of Jal Shakti during the Year-2021 are as under:

 

Ken-Betwa Interlinking of Rivers Project:

The Union Cabinet approved the funding and implementation of Ken-Betwa inter-linking of rivers project on 8.12.2021.  The total cost of Ken-Betwa link project has been assessed at Rs.44,605 crore at 2020-21 price levels.  On 22nd March 2021, in presence of the Hon’ble Prime Minister, a historic agreement was signed between the Union Minister of Jal Shakti and the Chief Ministers of Madhya Pradesh and Uttar Pradesh to implement the first major centrally driven river interlinking project in the country. This agreement heralds the beginning of inter- state cooperation to implement the vision of Sh. Atal Bihari Vajpayee to carry water from areas that have surpluses to drought prone and water deficit areas, through the interlinking of rivers.

 This project involves transfer of water from the Ken to the Betwa River through the construction of Daudhan Dam and a canal linking the two rivers, the Lower Orr Project, Kotha Barrage and Bina Complex Multipurpose Project. The project will provide an annual irrigation of 10.62 lakh ha, drinking water supply to a population of about 62 lakhs and also generate 103 MW of hydropower and 27 MW solar power. The Project is proposed to be implemented in 8 years with state of the art technology. 

The Project will be of immense benefit to the water starved Bundelkhand region, spread across the states of MP and UP.  This project will provide enormous benefits to the districts of Panna, Tikamgarh, Chhatarpur, Sagar, Damoh, Datia, Vidisha, Shivpuri and Raisen of Madhya Pradesh and Banda, Mahoba, Jhansi & Lalitpur of Uttar Pradesh. 

The project is expected to boost socio-economic prosperity in the backward Bundelkhand region on account of increased agricultural activities and employment generation. It would also help in arresting distress migration from this region.

This project also comprehensively provides for environment management and safeguards. For this purpose a comprehensive landscape management plan is under finalization by Wildlife Institute of India.

 

Dam Safety Bill (now Act), 2021

After China and USA, India is the 3rd largest dam-owning nation in the world. Although India’s track record of dam safety is at par with that of the developed nations, there have been instances of unwarranted dam failures and of poor maintenance issues.

The landmark Dam Safety Bill was passed by the Rajya Sabha on 2nd December, 2021, paving the way for enactment of the Dam Safety Act in the country. The Dam Safety Bill (2019) was passed by the Lok Sabha on 2ndAugust 2019. The Bill provides for adequate surveillance, inspection, operation, and maintenance of all the large dams in the country so as to prevent dam failure related disasters. The Bill provides for an institutional mechanism at both Central and State levels to address structural and non-structural measures required for ensuring the safe functioning of dams. 

As per the provision of the Bill, a National Committee on Dam Safety (NCDS) will be constituted to help evolve uniform dam safety policies, protocols, and procedures. The Bill also provides for the establishment of a National Dam Safety Authority (NDSA) as a regulatory body for ensuring the nationwide implementation of dam safety policies and standards. At the State level, the Bill prescribes for the constitution of State Committees on Dam Safety (SCDS) and the establishment of the State Dam Safety Organisations (SDSO).

The Dam Safety Bill also addresses in a comprehensive manner, critical concerns related to dam safety on account of emerging climate change related challenges. This Bill provides for regular inspection and hazard classification of dams. It also provides for drawing up of emergency action plans and comprehensive dam safety reviews by an independent panel of experts. There is provision for an emergency flood warning system to address the safety concerns of downstream inhabitants.

Through this Bill the Dam owners are required to provide resources for timely repair and maintenance of the dam structure, along with related machinery.

This Bill looks at Dam Safety holistically and provides for not only structural aspects, but also operational and maintenance efficacy through prescription of strict O & M protocols.

This Bill has penal provisions, involving offences and penalties, for ensuring compliance of the provisions.

Definite timelines have been provided in the Bill for the establishment of a robust institutional framework, with the support of both the Centre and the States. The Bill also focuses on implementation of mandatory dam safety actions by the dam owners within a defined timeline. The passage of this Bill heralds a new era of dam safety and water resources management in India.

 

Pradhan Mantri Krishi Sinchai Yojana (PMKSY)-

  1. Accelerated Irrigation Benefit Programmeme (AIBP)- Including CADWM: 

This Government is committed to ensure “हर खेत को पानीहर घर को जल”. To achieve this target schemes of the department of Water Resources, River Development and Ganga Rejuvenation like Pradhan Mantri Krishi Sinchai Yojana (PMKSY) and Atal Bhujal Yojana are ensuring targeted delivery. Under PMKSY, against the Ultimate Irrigation Potential of 76.03 Lakh ha., Irrigation potential of 63.85 Lakh ha. has been created up to 31.03.2021. 44 projects out 99 projects have been completed so far. 

The Government of India on 27.7.2016 approved funding of the 99 prioritized irrigation projects (and 7 phases) with an estimated balance cost of Rs. 77,595 Crore (Central share- Rs. 31,342crore; State share- Rs. 46,253 Crore) for completion in phases. The works include both the AIBP and CAD works. Funding arrangement for both Central Assistance (CA) and State Share made through NABARD under Long Term Irrigation Fund (LTIF). Targeted Irrigation Potential to be created under the scheme is 34.63 Lakh ha. An expenditure of Rs.50437 crore (upto March 2021) has been reported to be incurred by the concerned State Governments on these projects since 2016-17.

Government of India is implementing a scheme called Command Area Development & Water Management (CADWM) under Pradhan Mantri Krishi Sinchai Yojana (PMKSY). The scheme was launched with an aim to enhance physical access of water on farm and expand cultivable area under assured irrigation. During 2016-17 to 2020-21 (upto March, 2021), CA amounting to Rs 2747.35 Crore was released to 76 projects while the CCA progress reported by States is 14.96 Lakh ha. During 2021-22 (till 28th December 2021), CA amounting to Rs 33.71 Crore has been sanctioned to 01 project.

 

 

Implementation of PMKSY AIBP (including CADWM) during 2021-26:

The Government of India has approved implementation of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) for 2021-26 with an outlay of ₹93,068 Crore on date 15-Dec-2021 to benefit about 22 Lakh farmers. The Union Cabinet has approved central support of ₹37,454 Crore to States and ₹20,434.56 Crore of debt servicing for loan availed by Government of India for irrigation development during PMKSY 2016-21. 

A slew of Innovative measures and modification have been made to improve implementation and maximize benefits.

 

  1. Pradhan Mantri Krishi Sinchayi Yojana – Har Khet Ko Pani – Ground Water (PMKSY-HKKP-GW)

Pradhan Mantri Krishi Sinchayi Yojana (PMKSY) was formulated with the vision of extending the coverage of irrigation ‘Har Khet Ko Pani’ in a focused manner. Ground water component aims utilizing ground water for irrigation purpose in areas, where ground water is sufficiently available

The beneficiary under this scheme is small and marginal farmers only with priority to be given to SC/ST and Women farmers. Ground Water irrigation facility through Dug wells, Dug cum Bore wells, Tube wells and Bore wells etc. can be funded for schemes in areas categorized as SAFE and meeting the following criteria:

So far 15 projects in 12 States amounting Rs.1719 Crore were approved with Central assistance of Rs 1270 Crore. Up to 27th December’2021 Rs 458.41 Crore has been released as central Assistance to 10 States. However, Telangana and West Bengal states have not yet signed MOA for implementation of the scheme with DoWR, Ministry of Jal Shakti. 

As on November’2021, more than 22500 irrigation wells have been constructed and command area of more than 37700 ha has been created, benefiting nearly 36000 small and marginal farmers. 

 

Dam Rehabilitation and Improvement Project (DRIP) Phase II and Phase III:

India ranks third globally after China and USA with 5334 large dams in operation. About 411 dams are under construction. In addition, there are several thousand smaller dams. These dams are vital for ensuring the water security of the Country. The Union Cabinet approved externally aided DRIP Phase II and Phase III in its meeting held on October 29, 2020. 19 States and 3 Central Agencies are involved. The Budget Outlay is Rs. 10, 211 Cr. Duration of Scheme is ten (10) years, to be implemented in two phases, each of six (6) years duration with two (2) years overlap.

The Phase II of the Scheme is being co-financed by two multi-lateral funding Agencies – World Bank and Asian Infrastructure Investment Bank (AIIB). The Loan Agreement and the Project Agreements with World Bank in respect of 10 States and CWC, has been declared effective since October 12, 2021.

 

Central Water Commission:

CWC has conducted in-house Sedimentation Assessment Studies of 12 reservoirs using remote sensing technologies. These in-house studies have been conducted using Microwave data (instead of optical data). The advantage of using microwave data is that the images are not affected by cloud cover, and we get images of the reservoirs near FRL during monsoon season as well (which is relatively difficult with optical imageries as when the reservoir is full, most of the time it is monsoon season and it is cloudy). 

The nominations were processed for 4 historical irrigation structure of India for the “World Heritage Irrigation Structure Award (WHIS)” of ICID. In 2021, India won the highest number of WHIS awards. Four reservoirs that won WHIS in 2021 are: 1) Dhukwan Weir, U.P. 2) Grand Anicut, TN, 3) Veeranam Tank, TN, and 4) Kalingarayan Anicut, TN.

The monitoring of 477 glacial lakes & water bodies having size greater than 50 ha in the Indian Himalayan region using satellite remote sensing has been completed for the year 2021. This activity is carried out every year monthly from June to October.

During the year 2021, 3 new Flood Forecasting Stations (1 Level and 2 Inflow) have been added in the States of Rajasthan and Madhya Pradesh. During the period from 1st May to 14th December 2021, 10571 flood forecasts (6670 Level and 3901 Inflow) were issued, out of which 9935 (6456 Level and 3479 Inflow) forecasts were within limit of accuracy. Daily Flood Situation Reports and Special Advisories were also issued during extreme flood situations. 314 Red and 784 Orange Bulletins were also issued and updated on hourly and 3-hourly basis respectively. All flood information were updated in FF Website, Twitter and Facebook Pages of Flood Forecasting of CWC.

Monitoring of Reservoir: Number of reservoirs under the monitoring of Central Water Commission has increased to 133. Weekly Bulletins of Live Storage Status of the Country were issued even during the COVID 19 Pandemic Lockdown without fail. Simultaneously, weekly Bulletins of Live Storage Status of the Country were also issued for Crop Weather Watch Group Meeting of Ministry of Agriculture and Farmers’ Welfare every Friday even during the COVID 19 Pandemic situation.

 

 ATAL BHUJAL YOJANA (ATAL JAL)

 In a country like India, if we wish to achieve successful implementation of any scheme, community participation “जन भागीदारी” is an essential condition. Towards this end, Atal Bhujal Yojana has been designed with focus on community participation and demand side interventions for sustainable ground water management in identified water stressed areas. Atal Bhujal Yojana envisages improved source sustainability for Jal Jeevan Mission, positive contribution to the Government’s goal of doubling farmers’ income and inculcating behavioural changes in the community to facilitate optimal water use. Under Atal Bhujal Yojana, an amount of Rs. 109 crore has been released to the States in 2020-21.

 

Atal Bhujal Yojana (Atal Jal) is a Central Sector Scheme of Government of India with an outlay of Rs 6000 Crore, with focus on community participation and demand side interventions for sustainable ground water management in identified water stressed areas of seven States in the country viz. Gujarat, Haryana, Karnataka, Madhya Pradesh, Maharashtra, Rajasthan and Uttar Prasdesh. The scheme, partly funded by the World Bank, was launched by the Hon’ble Prime Minister on 25.12.2019 and is being implemented from 1.04.2020 for a period of 5 years. 

Central Ground Water Board:

1. National Aquifer Mapping and Management Programme: NAQUIM studies for aquifer mapping and management plan formulation have been taken up by CGWB under the scheme Ground Water Management & Regulation. During 2021 (1st January to 30th November 2021), Aquifer Maps and Management Plans for 3.7 Lakh km2 have been prepared covering various parts of the country. So far, under the Aquifer Mapping programme, an area of 18.4 lakh km2 has been covered out of the total ~25 lakh km2 area identified for mapping in the country.

 

High Resolution Aquifer Mapping and Management In Arid Areas Of India:

 

Central Ground Water Board (CGWB), Ministry of Jal Shakti has initiated also high resolution mapping of aquifers using modern heli-borne geophysical survey in parts of the arid areas spread over the states of Rajasthan, Gujarat and Haryana. The study has been taken up in collaboration with Ministry of Science and Technology. Under phase- I of the project, the work has been initiated in nearly 1 lakh sq km. Heli-borne survey under this project was inaugurated by Shri Gajendra Singh Shekhawat, Hon’ble Minister of Jal Shakti and Dr Jitendra Singh, Hon’ble Minister of State (Independent Charge) of Science & Technology on 5th October 2021 at Jodhpur, Rajasthan.

 

 

National Water Informatics Centre:

Realizing the need for availability of reliable and up-to-date water data for efficient management of water resources of the country, the Government has recently established National Water Informatics Center as a repository of nation-wide water resources data and as a reliable system for water resources data storage, collation, management and dissemination. Data on water resources and allied themes like rainfall, river water levels and discharge, ground water levels, reservoir levels, water quality, soil moisture, etc. are disseminated through a GIS enabled public platform “india.wris.gov.in” to all stakeholders and general public.

 

Progress under the scheme “Irrigation Census”:

Minor Irrigation Census conducted quinquennially in order to create a sound and reliable database on groundwater and surface water minor irrigation schemes in the country. The Minor Irrigation Census is conducted under the centrally sponsored scheme “Irrigation Census” with 100% central funding through which State Statistical Cells constituted under different States/UTs are also supported. The sixth Minor Irrigation Census with reference year 2017-18 is currently under implementation where in the Ministry has also launched the first Census of Water bodies covering all water bodies in the country, both rural and urban.

 

 Flood Management and Border Areas Programme (FMBAP)

The “Flood Management Programme (FMP)” and “River Management Activities and Works related to Border Areas” (RMBA) under operation during XII Five Year Plan were merged as “Flood Management and Border Areas Programme” (FMBAP) for the period 2017-18 to 2019-20 and further extended upto March, 2021. Since the inception of FMP, so far Central Assistance of Rs. 6447.76 Cr. has been released to Union Territories/State Governments under this programme. 415 projects completed under this Programme has given protection to an area of around 4.994 mha and protected a population of about 52.21 million.

 

India and Bangladesh Matters

 

1. India Bangladesh Water Resources Secretary Level meeting under the framework of Joint Rivers Commission held on 16th March, 2021 at New Delhi 

The India-Bangladesh Water Resources Secretary level meeting under the framework of the Joint Rivers Commission was held on 16th March 2021 at New Delhi. The Indian delegation was led by Shri Pankaj Kumar, Secretary (WR,RD &GR) and the Bangladesh delegation was led by Mr. Kabir Bin Anwar, Senior Secretary, Ministry of Water Resources, Government of the People’s Republic of Bangladesh

 

2. India-Bangladesh 75th Joint Committee Meeting and Technical Level Meeting held on virtual platform during 5th to 6th January, 2021 & Bangladesh 76th Joint Committee Meeting held at Dhaka on 25th November, 2021 

 

Meetings held for finalization of Annual Report on sharing of the Ganga/Ganges waters at Farakka for the lean season of the year 2020/21. 

 

NATIONAL RIVER CONSERVATION DIRECTORATE

Cleaning of river is a continuous process and Government of India is supplementing the efforts of the State Governments in addressing the challenges of pollution of rivers by providing financial and technical assistance. Assistance is provided to State Governments for abatement of pollution in identified stretches of various rivers (excluding river Ganga and its tributaries) under the Centrally Sponsored Scheme of National River Conservation Plan (NRCP) on cost sharing basis between the Central & State Governments for taking up various pollution abatement works relating to interception & diversion of raw sewage, construction of sewerage systems, setting up of sewage treatment plants, low cost sanitation, river front/bathing ghat development, etc. 

 

Jurisdiction of Krishna River Management Board (KRMB) & Godavari River Management Board (GRMB)

  • DoWR, RD&GR, Ministry of Jal Shakti issued the Notification of jurisdiction of KRMB/GRMB, Dated 15.07.2021. 

SURFACE MINOR IRRIGATION (SMI) AND REPAIR, RENOVATION AND RESTORATION (RRR) OF WATER BODIES SCHEMES OF PMKSY-HKKP:

Under the Repair, Renovation and Restoration (RRR) of Water Bodies scheme, since 12th plan onwards, 2218 schemes are ongoing with an estimated cost of Rs. 1910 crore. Central Assistance (CA) of Rs. 470 Crore has been released to states up to March, 2021. Further, 1591 water bodies have been reported to be completed up to March, 2021. Target irrigation potential restoration of these schemes is 1.888 L Ha and out of this, 1.319 L Ha is reported to be restored till March, 2021. In the current financial year, Rs. 6.645 Crore has been released to one RRR of Water Bodies schemes of Tamil Nadu till date.

National Hydrology Project

National Hydrology Project (NHP), a Central Sector Scheme, is being implemented w.e.f. by DOWR, RD & GR on pan India basis with the support of the World Bank. The objective of the project is to improve the extent, quality, and accessibility of water resources information and to strengthen the capacity of targeted water resources professionals and management institutions in India.

 

In line with the defined objective, NHP is striving hard to bring transformation in the water resources sector as a whole. Moving away from the current system of decision making based on experience and judgments’, improved water management is being attempted through introduction of informed decision making, relying on a host of modern analytical tools and loads of data from automated sensors on each component of the water cycle in real-time or near real-time. The same is being done in a collaborative mode by involvement of Central and State Government Organizations to ensure proper capacity building is there and the sense of ownership prevails among the Organizations referred as Implementing Agencies (IAs) of NHP. There are 48 IAs which are taking forward this initiative spanned over a period of 8 years (from 2016-17 to 2023-24). 

 

 

NATIONAL WATER MISSION:

“Catch the Rain Campaign”

 

“Catch the Rain” with a tagline “Catch the Rain – when it falls, where it falls” to nudge all stake-holders to create Rain Water Harvesting Structures (RWHS) suitable to the climatic conditions and sub-soil strata to catch the rains with the people’s active participation. Under this campaign drives to make water harvesting pits, rooftop RWHS, check dams, etc; removal of encroachments and de-silting of tanks to increase their storage capacity; removal of obstructions in the channels which bring water to them from the catchment areas, etc; repairs to step-wells and using defunct bore-wells to put the water back to aquifers, etc are some of the activities suggested to be taken up.

 

“Jal Shakti Abhiyan: Catch the Rain” campaign

Ministry of Jal Shakti has taken up the “Jal Shakti Abhiyan: Catch the Rain” (JSA:CTR) with the theme “Catch the Rain – Where it Falls When it Falls” to cover all the blocks of all districts (rural as well as urban areas) across the country druing 22nd March 2021 to 30th November 2021 – the pre-monsoon and monsoon period.

 

The “Jal Shakti Abhiyan: Catch The Rain” campaign was launched by the Hon’ble Prime Minister on 22 March 2021, the World Water Day, in a virtual event in which the Hon’ble PM addressed Central and State Government officers of the Department concerned, District Magistrates / District Collectors/ Deputy Commissioners of districts and Sarpanchs of Gram Panchayats through Video Conferencing. Hon’ble Prime Minister also interacted with five sarpanchs, one each from Maharashtra, Karnataka, Rajasthan, Gujarat and Uttarakhand- to discuss issues related to Water Conservation in their respective villages. On the same day the Gram Sabhas were also organized in these Gram Panchayats to take “Jal Shapath” and discuss issues related to water conservation.

 

Hon’ble Prime Minister wrote a letter dated 24.03.2021 addressed to all Sarpanchs in the country urging them to take steps for water conservation and play by play active role in JSA:CTR campaign and to ensure community participation. Hon’ble Prime Minister wrote a letter dated 25.03.2021 to Hon’ble Chief Ministers of states seeking their co-operation.

 

NATIONAL MISSION FOR CLEAN GANGA:

The government notified NMCG as an authority under EP Act, 1986 and created empowered institutions and laid down fundamental principles with a comprehensive framework for rejuvenation of rivers in Ganga Basin. This approach is now considered a model for application for rejuvenation of other rivers in the country. It integrates rivers, tributaries, wetlands, flood plains, springs and small rivers as a singlesystem. 344 projects have been sanctioned under Namami Gange at a cost of Rs. 29,990 crores for sewerage projects, industrial pollution abatement, River front Ghats and crematoria, afforestation and biodiversity conservation, Rural sanitation and other related projects. Out of it, 147 projects have been completed and the remaining are under execution. Pace of execution has increased manifold reflected in total expenditure of Rs. 10,100 crores from 2014 till March 2021. This is more than double as compared to that from 1985-86 to 2014.

In 2021, the National Mission for Clean Ganga (NMCG) sanctioned 24 projects at a total cost of Rs 1208.77 Cr., bringing the cumulative total to 357 projects sanctioned worth Rs 30,780.18 Cr. In the same period, NMCG also completed 37 projects which resulted in the completion of total 177 projects. 

With regard to sewerage infrastructure, 18 projects were completed this year. Till date, 160 sewerage infrastructure projects have been sanctioned in the Ganga Basin for the creation of 5,024 MLD treatment capacity and 5,227 km sewer network. On 25th October 2021, Hon’ble Prime Minister inaugurated the 10 MLD STP at Ramnagar, Varanasi District as well as 8 kunds in Varanasi.

Several public outreach programmes were also organized by NMCG, which included Ganga Quest, Ganga Utsav, Ganga Mashal Abhiyan, etc. – all of which received an overwhelming response. Ganga Quest 2021 saw active participation of over 11 Lakh persons from India as well as from over 113 countries. Ganga Utsav 2021, organized under the Azaadi Ka Amrit Mahotsav campaign, celebrated not just River Ganga but all other rivers in the country. It responded to the clarion call given by Hon’ble Prime Minister and laid the foundation for Nadi Utsav, wherein festivities were conducted across the country in collaboration with Ministry of Culture and Ministry of Tourism. During Ganga Utsav, NMCG also set the world record for the ‘most photos of handwritten notes uploaded to Facebook within an hour’ for the Guinness Book of World Records.

 

********


Should water resources be nationalized?

Water takes an indispensable role in our daily being like it is an integral part for our living and prominent for every human body and also for several other purposes. It is a universal need but is it available universally to all through out  the world with parity. Despite its importance for life, fresh water is an extremely rare resource on earth. The available surface fresh water is not equally distributed throughout the world and not easily accessible to humans. 69% of earths fresh water is locked in the form of ice in glaciers and 30% is under the surface as ground water. And nearly just 1% is readily available for human use.  So one of the significant ways that we can implement to get rid of the water crisis is nationalizing the water resources to make that 1% of fresh water available on earth to be accessed by everyone and attainable in all places without any bias. Nationalizing water sources mean the control over handling all water resources like dams, rivers, lakes, pipes etc. by the nation or state. Proponents of the project claim the answer to India’s water problem is to conserve the abundant monsoon water bounty, store it in reservoirs, and deliver the water using rivers interlinking project to areas and over times when water becomes scarce.

Merits

This will aid the nation to a great extent and also help  in the eradication of floods and droughts – which are the two extremes. Floods happen when there is an overflow of water that submerges the lands. Conversely droughts happen when there is lack of water resources and It takes decades to develop fully and very difficult to predict. This portrays the devastation state of how the water resources are erratic and unevenly distributed  over the world and causes calamities. It would be pertinent  to mention about the Tamil Nadu and Karnataka issue over the water resources since many years. The sharing of waters of the Kaveri river has been the source of a serious conflict and has been the bone of content between the two states. And the curtains were brought  down only after  years. These conflicts over water resources are common through out the world. For instance Ethiopia and Egypt have fought long over  Nile water resources . The Nile is an important waterway that supplies 85% of Egypt however the Nile’s water originates in Ethiopia and they plan to dam part of the river in order to generate electricity , Egypt will be adversely impacted. Even in the United States where freshwater resources are relatively abundant different populations fight over the use of fresh water.

It becomes apparent that when a river originates in a particular area, the other regions need to be dependent of them and conflict between states arise and it becomes very challenging. So linking of rivers would certainly make us get out of such situations and could curtail civil wars. Some fertile lands are turning out into barren lands due to the lack of water facility in many regions. Because of the unequal distribution of water human population are some times deprived of safe drinking water and pushed to a state of consuming contaminated  water which carry risks of infectious diseases. Lack of access to clean drinking water leads to more than 3 million death every year. So the linking of the rivers will work for the betterment of situation and can assure safe drinking water to all. Despite drinking, the fresh water is also an important need in economic activities such as agriculture, and other cultivation. There are states in India where water is very scarce and also with adequate/ plentiful water resources. So when the linking of rivers happen everyone would be equally distributed with water.

Demerits

The allocation of water may be a problem. Every region has its own demand and needs of more and more water supply. It will be challenging for the center to divert water resources from one state towards the other. In some regions there will be accidental flow of industrial wastes into the river, if the rivers are linked, the polluted water will spread all over the country. It requires lakhs of acres of lands to build dams and connect the rivers, the construction may get complicated and years to get completed. Leakage of pipeline is another issue that goes unchecked in many places. To nationalize water resources every state has to agree for the proposal. As it is a large scale project, well planed architecture is needed to connect all the rivers. It should consist experts in the technology of water resource management and have authority over the water resources of the entire nation. When the control over resources goes under the central authorities , the states would become vulnerable to lose their power. Just by nationalizing the water resources the crisis of water deficiency could not be solved. People need to become aware of the deficiency and prevent wastage of water and save water efficiently. The governments as well can frame water conservation methods and allocate funds to implement them respectively.

Conserve water before the world goes dry !!